  "cadence": "Daily, 07:00 America/New_York",
  "coverage_gaps": [
    "Registration 74220 has no established county-campus match; its notice is not assigned to a nearby parcel. Its published comment period has ended; no executed consent order or extension was established.",
    "The historical finance FAQ remains unavailable; its 38% and 4% figures still require corroboration.",
    "Private or unpublished contracts and unannounced construction completions cannot be certified by this public-source review.",
    "Calendar coverage is incomplete. Automated SCC, DEQ and USACE source failures remain in meetings-status.json; manual review of selected pages does not establish comprehensive coverage.",
    "The Planning Commission September 22 hearing folder is reachable and was reviewed October 17, but lists the agenda, staff reports and July 23 draft minutes, not September 22 minutes. No September 22 vote outcome is inferred from those documents.",
    "News-feed inclusion and reachable resource links do not independently verify every assertion on those pages.",
    "LandMARC lists a signed response for ZCOR-2026-0188 uploaded October 16, but its public attachment control did not yield a downloadable document during review. The case status and closure date were verified; the determination terms and any vested rights were not established from the unread letter.",
    "The October 20 Board report itself did not establish formal application withdrawal. The public LandMARC record now confirms EPLAN-2026-0110 was withdrawn effective October 22. A final executed agreement, recorded conveyance, final rezoning and housing performance remain unverified.",
    "Calendar coverage remains incomplete: automated Loudoun RSS, SCC webcast, DEQ and USACE checks have access-policy or 403 failures. The October 27 Planning Commission hearing for LEGI-2025-0032 (Berwick Energy Center) is now available in the official Granicus archive. Its official captioned recording records a 9–0 Commission recommendation of approval to the Board. The item is a proposed utility-scale battery-storage facility near a NOVEC substation, not a data-center project; final Board action remains unverified. No broader calendar completeness is claimed.",
    "The DEQ air-site and emissions layers 294, 298 and 292 became queryable again on October 26 and were refreshed October 28 at 13:41Z. The issued permit index continues to return HTTP 403; all 106 linked PDF checks were blocked on October 28. Air sites, emissions and PEC records were refreshed and retain their own source vintages; the last-good issued-index snapshot remains dated October 13 and retrieved October 17. No revised permit PDFs or quantities are asserted.",
    "Registration 74287 matches only the broad Broad Run Technology Park parcel group, not a unique campus or building; registration 74284 still has conflicting campus candidates. No operation/completion status is inferred from air-site labels."
  ],
  "findings": [
    {
      "result": "October 22 live county checks retain 224 parcels (103 operational, 36 under construction, 85 proposed), 271 footprints, eight districts and no parcel transitions. The rolling 18-month application list now has 80 substantive cases and 16 routine filings set aside; ZCOR-2025-0182 has aged out of that window, not been cancelled or completed. The newest filing remains PMTG-2026-0221, filed October 12 and In Review. No remaining case status changed against yesterday’s snapshot. County source vintages remain September 3, 2026, May 21, 2026 and January 27, 2025. LandMARC routes are retained. The previously listed signed ZCOR-2026-0188 response remains unread; no vested-rights terms or campus-completion conclusion is added.",
      "reviewed_at": "2026-10-22T12:59:53+00:00",
      "scope": "County GIS, campus status, districts and applications",
      "sources": [
        "https://logis.loudoun.gov/gis/rest/services/Projects/LOLA_DATA/MapServer/0",
        "https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Existing_Data_Center_Parcel/FeatureServer/1",
        "https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1",
        "https://logis.loudoun.gov/gis/rest/services/Projects/LOLA_DATA/MapServer/0/query?where=PlanNumber%3D%27PMTG-2026-0221%27&outFields=*&returnGeometry=false&f=pjson",
        "https://www.loudoun.gov/landmarc",
        "https://www.loudoun.gov/m/newsflash/Archive/Item/8552?arcId=15908",
        "https://logis.loudoun.gov/gis/rest/services/Projects/LOLA_DATA/MapServer/0/query?where=PlanNumber%3D%27ZCOR-2026-0188%27&outFields=%2A&returnGeometry=false&f=pjson",
        "https://loudouncountyvaeg.tylerhost.net/prod/selfservice#/plan/9c8baa00-9134-4759-be83-1af6462d13f2",
        "https://loudouncountyvaeg.tylerhost.net/prod/selfservice#/plan/bec208af-5137-45cb-97fb-b13b8ae9964b",
        "https://loudouncountyvaeg.tylerhost.net/prod/selfservice#/plan/761c3388-4fad-4b35-aafd-dd3968d6602b"
      ]
    },
    {
      "index_reviewed_at": "2026-10-17T15:52:02+00:00",
      "result": "October 22 live DEQ air-site, reported-emissions and PEC checks retain 89 registrations, 5,699 PEC-documented generators and 420 emissions rows. PEC source vintage remains July 23. The issued index and Microsoft notice returned access-blocked responses; the last successful index review remains October 17, of the index dated October 13. All 106 automated permit-PDF checks were blocked. No normalized equipment quantities, limits, installed-equipment claims or notice status changed. Prior PDF review dates and hashes remain unchanged.",
      "reviewed_at": "2026-10-22T13:01:04+00:00",
      "scope": "Issued permits, equipment and emissions",
      "sources": [
        "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
        "https://gisdata.deq.virginia.gov/arcgis/rest/services/public/EDMA/MapServer/294/query?where=PLA_REG_NUM%3D74276&outFields=%2A&returnGeometry=false&f=pjson",
        "https://gisdata.deq.virginia.gov/arcgis/rest/services/public/EDMA/MapServer/294/query?where=PLA_REG_NUM%3D74287&outFields=%2A&returnGeometry=false&f=pjson",
        "https://www.deq.virginia.gov/home/showpublisheddocument/35462/639268002667200000",
        "https://www.deq.virginia.gov/Home/Components/Calendar/Event/5419/17"
      ]
    },
    {
      "document_reviews": [
        {
          "document_date": "2026-10-09",
          "event_date": "2026-10-06",
          "pages": [
            4,
            5,
            6
          ],
          "reviewed_at": "2026-10-12T13:46:57+00:00",
          "sha256": "bb3ac4727c2899829a31de99219e38e9888a60dce4b716d07b04dee980c0c64d",
          "url": "https://lfportal.loudoun.gov/LFPortalInternet/0/edoc/1975929/Action%20Report%2010-06-26%20Business%20Meeting.pdf"
        },
        {
          "document_date": "2026-10-16",
          "event_date": "2026-10-14",
          "pages": [
            1,
            2,
            3,
            4
          ],
          "reviewed_at": "2026-10-16T22:05:41+00:00",
          "sha256": "2830c7c191d6ab2b9d67b424538736dde5579c695650f0a59a4276783e57a24e",
          "url": "https://pub-loudoun.escribemeetings.com/FileStream.ashx?DocumentId=2032"
        }
      ],
      "result": "Reconfirmed the revised October 20 Board agenda: item 14.p proposes a legislative data-center/substation pause, item 14.j addresses Quantum Park, item 14.o proposes advancing Golden Substation consideration from December 1 to November 5, and item 15.c proposes closed-session legal advice on grandfathering. These remain scheduled proposals pending Board action. Reviewed the Planning Commission September 22 and October 8 archive folders: no September 22 minutes were listed; agenda and staff reports do not establish votes. LandMARC shows ZCOR-2026-0188 Approved and the correspondence case closed October 16. A signed response is listed as uploaded October 16, but could not be downloaded through the public attachment control. Its determination terms were not read and no vested-rights conclusion is published. Earlier action-report document review dates below remain unchanged.",
      "reviewed_at": "2026-10-17T15:52:02+00:00",
      "scope": "Official decisions and planning records",
      "sources": [
        "https://www.loudoun.gov/Calendar.aspx?EID=18972",
        "https://www.loudoun.gov/SignuptoSpeak",
        "https://pub-loudoun.escribemeetings.com/",
        "https://pub-loudoun.escribemeetings.com/Meeting.aspx?Id=7960f118-c668-45ef-a975-2362de95de1c&Agenda=Agenda&lang=English",
        "https://www.loudoun.gov/m/newsflash/home/detail/10874",
        "https://pub-loudoun.escribemeetings.com/Meeting.aspx?Id=22e65f92-8862-46da-afba-f594bd09768a&Agenda=Merged&lang=English",
        "https://pub-loudoun.escribemeetings.com/FileStream.ashx?DocumentId=2032",
        "https://pub-loudoun.escribemeetings.com/Meeting.aspx?Id=e31b8d42-ad0e-4f6c-b33c-248ecd254ebb&Agenda=Agenda&lang=English",
        "https://lfportal.loudoun.gov/LFPortalinternet/0/fol/1975500/Row1.aspx",
        "https://lfportal.loudoun.gov/LFPortalinternet/0/fol/1975766/Row1.aspx",
        "https://loudouncountyvaeg.tylerhost.net/prod/selfservice#/plan/9c8baa00-9134-4759-be83-1af6462d13f2?tab=attachments"
      ]
    },
    {
      "document_reviews": [
        {
          "document_date": "2026-06-26",
          "pages": [
            13
          ],
          "reviewed_at": "2026-09-28T11:16:03+00:00",
          "sha256": "16fadf270e78e429d8da4f4ebe9a6c74e800aba681d1165129dd71e7959afbb8",
          "url": "https://cdn-dominionenergy-prd-001.azureedge.net/-/media/content/about/power-line-projects/beco-to-firehouse/beco-firehouse-scc-order-for-notice-and-comment.pdf?hash=40E2630329042285C2E655A2573959A0&rev=796eda8f4f254b879b063caa795bc041"
        },
        {
          "document_date": "2026-06-29",
          "pages": [
            2
          ],
          "reviewed_at": "2026-09-28T11:16:03+00:00",
          "sha256": "05ef6d149c45c275b711a0a561256debdcd5fa6e3df08bb87fdaba30c5de52bd",
          "url": "https://www.scc.virginia.gov/docketsearch/DOCS/8d5601!.PDF"
        }
      ],
      "result": "The SCC merger page now says updated October 20. Its November 2 witness-registration deadline, November 5, 9 and 10 testimony sessions, November 12 written comments and November 17 evidentiary start remain unchanged. The webcast calendar confirms November 16 and 17 proceedings and the Doubs-Goose Creek January 12, 2027 proceeding. No merger approval is inferred. Current reporting describes an October 20 Project Potomac Promise announcement and Amazon agreeing to withdraw the former GW campus data-center proposal. An executed agreement, completed land conveyance, final rezoning or new whole-campus completion was not established, and no county map fact was replaced by a headline. The Sterling turbine article describes a possible future power transition, not a verified shutdown.",
      "reviewed_at": "2026-10-22T12:59:53+00:00",
      "scope": "Public agreements, construction completion and utility activity",
      "sources": [
        "https://www.scc.virginia.gov/about-the-scc/dominion-nextera-merger-updates/",
        "https://www.scc.virginia.gov/case-information/submit-public-comments/cases/pur-2026-00112.html",
        "https://www.scc.virginia.gov/case-information/webcasting/",
        "https://insidelines.pjm.com/ferc-accepts-pjm-reliability-backstop-proposal/",
        "https://www.datacenterdynamics.com/en/news/amazon-withdraws-application-for-data-center-campus-at-gwu-site-in-ashburn-virginia/",
        "https://bluevirginia.us/2026/10/loudoun-county-chair-phyllis-randall-announces-amazon-has-agreed-to-withdraw-its-proposed-application-and-forego-any-legal-action-to-realize-data-center-development-on-the-gwu-science-technolog1/"
      ]
    },
    {
      "result": "October 22 finance checks found six accessible sources unchanged after retrying JLARC with a compressed response; the historical FAQ remains HTTP 404. Reviewed Board and Planning Commission directories show the existing roster. Resource and representative-service results are reported individually in maintenance-status.json. Finance baselines and figures remain unchanged; successful link checks do not certify all content on those pages.",
      "reviewed_at": "2026-10-22T13:03:06+00:00",
      "scope": "Finance, officials and resources",
      "sources": [
        "https://www.loudoun.gov/bos",
        "https://onboard.loudoun.gov/board/3524",
        "https://www.loudoun.gov/budget",
        "https://www.loudoun.gov/6409/Tax-Revenues-County-Budget",
        "https://www.loudoun.gov/landmarc"
      ]
    },
    {
      "result": "Reviewed the county October 20 deferral notice and the current eSCRIBE upcoming-meeting listing. Corrected the past October 20 reminder and added the November 17, 4 p.m. Board discussion to the public calendar, retaining the old meeting ID and increasing its sequence. Added the dated official deferral notice to news and feeds. The resolution remains a proposal. News collection October 22 is partial: nine feeds succeeded and Virginia Mercury timed out; prior archive items are retained. The latest calendar scan has four successful sources and four access-policy failures. Search and feeds are rebuilt from the current public data. Retrieval dates and editorial review dates remain separate.",
      "reviewed_at": "2026-10-22T12:59:53+00:00",
      "scope": "News, search, feeds and public calendar",
      "sources": [
        "https://www.loudoun.gov/6222/Phase-2-Data-Center-Standards-Locations",
        "https://www.scc.virginia.gov/case-information/webcasting/",
        "https://www.deq.virginia.gov/news-info/shortcuts/public-notices",
        "https://www.loudoun.gov/Calendar.aspx?EID=18972",
        "https://www.loudoun.gov/SignuptoSpeak",
        "https://pub-loudoun.escribemeetings.com/Meeting.aspx?Id=22e65f92-8862-46da-afba-f594bd09768a&Agenda=Merged&lang=English",
        "https://www.loudoun.gov/m/newsflash/home/detail/10938",
        "https://pub-loudoun.escribemeetings.com/?Year=2026"
      ]
    },
    {
      "result": "Reviewed the official October 20 Board Action Report (dated October 22), county October 22 preliminary Amazon release, eSCRIBE upcoming-meeting listing, SCC webcast calendar and official October 27 Planning Commission agenda. Quantum Park was denied 7–2; the 500-foot setback/co-location motion failed 6–3; Golden Substation action was advanced to November 5 by 8–0–1; the pause remained unadopted and was deferred to November 17. Board directions authorize continued Amazon negotiations but do not establish an executed agreement, land transfer, final rezoning or application withdrawal. Added dated official records to news and calendar. The October 27 Planning Commission agenda contains no data-center or substation items. Air inventory refresh retained 89 registrations / 86 DEQ air sites / 91 issued-index records; PEC source vintage remains July 23. Issued index returned 403 and all 106 permit-PDF checks were unavailable, so no revised PDFs or quantities were published. County GIS parcel source had no fingerprint changes; retrieval does not change its source vintage. Financial sources and figures were unchanged; historical FAQ remains unavailable.",
      "reviewed_at": "2026-10-25T01:44:59Z",
      "scope": "County actions, scheduled decisions, permits, generators, emissions and sources",
      "sources": [
        "https://lfportal.loudoun.gov/LFPortalinternet/0/edoc/1976200/10-20-26%20Business%20Meeting%20Action%20Report.pdf",
        "https://www.loudoun.gov/m/NewsFlash/Home/Detail/10944",
        "https://www.loudoun.gov/m/newsflash/home/detail/10938",
        "https://pub-loudoun.escribemeetings.com/?Year=2026",
        "https://loudoun.granicus.com/AgendaViewer.php?view_id=92&event_id=4396",
        "https://www.scc.virginia.gov/case-information/webcasting/",
        "https://gisdata-virginia.opendata.arcgis.com/"
      ]
    },
    {
      "result": "Daily review: county GIS refreshed 139 existing parcels, 85 pipeline parcels, 271 building outlines and 8 districts; counts and feature statuses unchanged. Source vintages remain Sep 3, May 21 and Jan 27 2025. The rolling application watcher reports 78 substantive and 18 routine cases but does not return EPLAN-2026-0110; the public LandMARC record independently confirms that Bridgefield Tech Center application was withdrawn effective Oct 22. Related ZCOR-2026-0246 remains In Review. This verifies the application status only: final agreements, transfer, rezoning and completion are not established, and county GIS campus status was not changed. The Oct 26 11:32Z air refresh successfully queried DEQ air-site layers 294/298 and emissions layer 292, refreshing those datasets; PEC refreshed with July 23 source vintage. The issued permit index still returns HTTP 403 and all 106 PDF link checks are blocked, so the last-good issued index remains dated Oct 13 and no changed permit PDFs or quantities are claimed. News, finance, officials and meeting sources were checked; finance six unchanged, historical FAQ 404, and calendar coverage gaps persist.",
      "reviewed_at": "2026-10-26T11:32:50Z",
      "scope": "Daily source refresh, air permit transparency, development status, meetings, finance and officials",
      "sources": [
        "https://gisdata.deq.virginia.gov/arcgis/rest/services/public/EDMA/MapServer/294",
        "https://gisdata.deq.virginia.gov/arcgis/rest/services/public/EDMA/MapServer/298",
        "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
        "https://www.loudoun.gov/m/NewsFlash/Home/Detail/10944",
        "https://finance.yahoo.com/technology/articles/amazon-com-amzn-cancels-427-221154816.html",
        "https://www.washingtonpost.com/dc-md-va/2026/10/22/amazon-wont-build-data-centers-loudoun-county-deal-with-local-leaders/",
        "https://www.loudoun.gov/bos",
        "https://www.loudoun.gov/CivicAlerts.aspx?AID=10356",
        "https://www.loudoun.gov/6222/Phase-2-Data-Center-Standards-Locations",
        "https://loudouncountyvaeg.tylerhost.net/prod/selfservice#/plan/a44ce8ba-f8db-4702-b500-6bfd5ce7c4e8",
        "https://loudouncountyvaeg.tylerhost.net/prod/selfservice#/search?m=1&fm=1&ps=10&pn=1&em=true&st=EPLAN-2026-0110",
        "https://www.loudoun.gov/landmarc"
      ]
    },
    {
      "result": "October 28 review: county GIS refresh returned 139 existing parcels, 85 pipeline parcels, 271 building outlines and 8 districts; counts and parcel statuses were unchanged. The application watcher now reports 77 substantive/18 routine filings (one case, EPLAN-2025-0072 filed Apr 17 2025, aged out of the 18-month window; not a cancellation or status change); 222 parcel fingerprints had zero transitions. County source edit vintages remain Sep 3, May 21, 2026, and Jan 27, 2025. DEQ air-site and emissions queries succeeded Oct 28 and refreshed 86 air sites and 420 emissions rows; PEC returned 5,699 documented generator records, with source edit vintage July 23. The issued air-permit index returned HTTP 403 and all 106 PDF checks were blocked; the last-good index remains as of Oct 13/retrieved Oct 17. No changed PDF or permit quantity is asserted. Finance: six sources unchanged, historical county FAQ still HTTP 404. News collection: 10/10 feeds reachable, 842 records, latest checked Oct 28; official county release 10948 (Oct 23), Code of Virginia §15.2-2209.5, and the current HEUF checklist/affidavit reviewed. Legislative applicants must provide the HEUF disclosure and utility correspondence on anticipated energy/voltage; qualifying HEUF filings require the listed sound/resource/utility documentation. By-right approvals are excluded and the checklist exempts residential proposals. The Oct 27 Planning Commission packet for LEGI-2025-0032, Berwick Energy Center, proposed utility-scale battery storage on a 5.5-acre parcel near a NOVEC substation. Staff recommended that the Commission recommend approval to the Board. A current Granicus check found the event page but no public recording/minutes establishing the Commission action; no vote or approval is inferred. This proposal is an energy-storage/grid use, not a data-center project or evidence of a data-center service contract. Coverage gaps for other calendar feeds remain documented in meetings-status.json.",
      "reviewed_at": "2026-10-28T13:39:39Z",
      "scope": "Daily source refresh; HEUF application requirements; Planning Commission utility-scale storage agenda; air permits, generators, emissions, finance, news and official coverage gaps",
      "sources": [
        "https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Existing_Data_Center_Parcel/FeatureServer/1",
        "https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1",
        "https://logis.loudoun.gov/gis/rest/services/Projects/LOLA_DATA/MapServer/0",
        "https://gisdata.deq.virginia.gov/arcgis/rest/services/public/EDMA/MapServer/294",
        "https://gisdata.deq.virginia.gov/arcgis/rest/services/public/EDMA/MapServer/298",
        "https://gisdata.deq.virginia.gov/arcgis/rest/services/public/EDMA/MapServer/292",
        "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
        "https://www.loudoun.gov/m/newsflash/Home/Detail/10948",
        "https://law.lis.virginia.gov/vacodeupdates/title15.2/section15.2-2209.5/",
        "https://www.loudoun.gov/LegislativeLandUse",
        "https://www.loudoun.gov/DocumentCenter/View/222762/HB153-HEUF-Checklist-10192026",
        "https://www.loudoun.gov/DocumentCenter/View/222763/HEUF-Affidavit-10192026",
        "https://loudoun.granicus.com/AgendaViewer.php?view_id=92&event_id=4396",
        "https://loudoun.granicus.com/MetaViewer.php?view_id=92&event_id=4396&meta_id=286927",
        "https://www.loudoun.gov/Calendar.aspx?EID=19024",
        "https://www.scc.virginia.gov/case-information/webcasting/",
        "https://www.pjm.com/committees-and-groups/committees/teac",
        "https://loudoun.granicus.com/GeneratedAgendaViewer.php?event_id=4396&view_id=92",
        "https://loudoun.granicus.com/MediaPlayer.php?view_id=92&event_id=4396"
      ]
    },
    {
      "result": "October 29 source refresh: Loudoun GIS returned 139 existing parcels, 85 pipeline parcels, 271 building outlines and 8 districts, with no parcel/status transitions; the rolling application watcher returned 76 substantive and 17 routine filings. County feature-layer edit vintages remain September 3, May 21, 2026, and January 27, 2025. Separately, the County Planning/Zoning building inventory page still matches its dated March 1, 2026 table: 233 built or under-construction buildings, 116 approved/administrative pipeline buildings (including 58 still in site-plan review), and 56 buildings in 21 pending legislative applications. These estimates are building counts, distinct from parcel and footprint counts; the 116 are not all fully permitted. DEQ returned 89 registrations, 86 Loudoun air sites (76 operating, 11 planned), and 420 reported-emissions rows; PEC lists 5,699 documented generators, source vintage July 23. The issued-permit index returned HTTP 403 and all 106 PDF checks were blocked, so the last-good index (as of October 13; retrieved October 17) is retained and no changed PDFs or quantities are asserted. Six accessible finance sources were unchanged; the historical tax FAQ remains HTTP 404. News refresh completed (544 fetched, 858 after de-duplication and collapsing retellings); official County releases on HEUF documentation, the preliminary Amazon/GWU terms, and deferral of the proposed data-center/substation pause were checked. The October 20 Board action report records Quantum Park denial 7–2, a failed setback/co-location motion 6–3, Golden Substation action advanced to November 5 by 8–0–1, continued Amazon negotiations without finalized agreement, and deferral of the pause proposal to November 17. LandMARC still records EPLAN-2026-0110 withdrawn effective October 22; final agreement, conveyance, rezoning and performance remain unverified. The official October 27 Granicus archive now exposes clip 8277 and captions. The captioned recording records the Planning Commission voting 9–0 to recommend approval to the Board for LEGI-2025-0032, Berwick Energy Center, a utility-scale battery-storage proposal near a NOVEC substation. This is a Commission recommendation, not Board approval or a data-center project; next Board status has not been established. SCC merger case page was updated October 28; listed November participation and hearing dates remain future events, with no approval implied. Automated source failures and other coverage gaps remain documented.",
      "reviewed_at": "2026-10-29T14:55:41Z",
      "scope": "Daily refresh of county GIS/applications, air permits/generators/emissions, finance, news, Board and Planning Commission actions, utility/SCC records and source coverage",
      "sources": [
        "https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Existing_Data_Center_Parcel/FeatureServer/1",
        "https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1",
        "https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Data_Center_Building_Outlines/FeatureServer/0",
        "https://logis.loudoun.gov/gis/rest/services/COL/ElectionDistricts/MapServer/8",
        "https://logis.loudoun.gov/gis/rest/services/Projects/LOLA_DATA/MapServer/0",
        "https://gisdata.deq.virginia.gov/arcgis/rest/services/public/EDMA/MapServer/294",
        "https://gisdata.deq.virginia.gov/arcgis/rest/services/public/EDMA/MapServer/298",
        "https://gisdata.deq.virginia.gov/arcgis/rest/services/public/EDMA/MapServer/292",
        "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
        "https://www.loudoun.gov/m/newsflash/Home/Detail/10948",
        "https://www.loudoun.gov/m/newsflash/Home/Detail/10944",
        "https://www.loudoun.gov/m/newsflash/Home/Detail/10938",
        "https://lfportal.loudoun.gov/LFPortalInternet/0/edoc/1976200/10-20-26%20Business%20Meeting%20Action%20Report.pdf",
        "https://loudoun.granicus.com/AgendaViewer.php?view_id=92&clip_id=8277",
        "https://loudoun.granicus.com/MediaPlayer.php?view_id=92&clip_id=8277",
        "https://loudoun.granicus.com/videos/8277/captions.vtt",
        "https://loudouncountyvaeg.tylerhost.net/prod/selfservice#/plan/a44ce8ba-f8db-4702-b500-6bfd5ce7c4e8",
        "https://www.scc.virginia.gov/about-the-scc/dominion-nextera-merger-updates/",
        "https://www.scc.virginia.gov/case-information/webcasting/",
        "https://www.loudoun.gov/6408/Data-Centers-The-Loudoun-Story",
        "https://www.loudoun.gov/DocumentCenter/View/222160"
      ]
    }
  ],
  "follow_up": [
    "Check the Board referral/status for LEGI-2025-0032 after the Planning Commission’s 9–0 recommendation; confirm any hearing date and final Board action from official records.",
    "Verify the November 5 Board action on Golden Substation and any published agenda time; recheck the November 17 pause proposal, keeping it unadopted unless an official vote confirms action.",
    "Recheck DEQ for an executed Microsoft consent order or revised notice; retain proposed status until supported by an executed record.",
    "Confirm a new hearing date for deferred Spring Valley Technology Park from an explicit county notice; the October 14 action report lists no Spring Valley action.",
    "Recheck Planning Commission outcome records and permit PDFs when available; retain dated reviewed records meanwhile. Reattempt the signed ZCOR-2026-0188 response and review its terms before publishing a vested-rights conclusion.",
    "Recheck SCC docket orders and the merger page for any further change to the November 12 written-comment deadline; the cutoff time remains unverified.",
    "Read the executed Project Potomac Promise agreement and county withdrawal/conveyance/rezoning records before treating announced commitments as completed legal actions.",
    "Recheck DEQ GIS queries 294, 298 and 292 and the issued index/PDF links; if access returns, compare source vintages and read revised documents before updating any permit facts."
  ],
  "reviewed_at": "2026-10-29T14:55:41Z",
  "status": "reviewed_with_coverage_gaps"
}